Faith Forge LabsChile
EnglishEspañol

Ask what approval permits before automating the next action

A workflow may contain an “approve” button without a shared understanding of what it authorizes. Before connecting that button to a customer message, assignment or financial operation, write down the decision it represents.

This fictional exercise concerns office review of a field report. It uses the questions to resolve an actual scope choice rather than leave them as a checklist.

Which object is being approved?

Report REP-17 describes visit V-17 on job J-17. The field colleague has submitted it for review. The office currently marks a checkbox labeled “approved,” but different staff interpret it differently.

One reviewer means that the report is complete enough for the customer to read. Another means that the job is ready for billing. The proposed automation would send the report and create a billing handoff whenever the checkbox changes.

Those are two consequences attached to one ambiguous decision.

What evidence does the reviewer actually inspect?

The organization examines its process using the fictional record. The report reviewer checks the description, attachments and customer wording. They do not verify the commercial agreement or any adjustment to the approved price.

The billing reviewer separately checks the accepted work and commercial record. The report review therefore does not supply all the evidence required for the billing handoff.

The business owners resolve the meaning: report approval authorizes publication of that report. Billing readiness remains a separate decision with a different reviewer.

What should the first automation do?

The first scope publishes an approved report to the permitted customer area and records its publication state. It does not create the billing transfer.

REP-17 is approved and becomes visible to the intended customer. The billing queue remains unchanged. A report REP-18 with a missing attachment stays in review and is not published. An unrelated customer cannot open REP-17 through a copied link.

The billing reviewer later marks J-17 ready for the approved handoff. That action is tested separately against the chosen receiving process. The distinction remains visible in both the office view and the maintenance instructions.

The office can now publish an approved report without silently initiating the billing process.

What happens when an approval is corrected?

Suppose the office discovers an error after publication. The project must define how to withdraw or replace the report, what history is retained and what the customer should see. Changing a database flag may not recall a document already downloaded or a message already sent.

The fictional first scope includes replacing the customer-area document through an authorized revision action and recording the earlier publication. It does not promise to retrieve copies already outside the system. Customer communication about a correction remains an office responsibility.

Who can change the rule later?

The handover names the business owners for report publication and billing readiness. A maintainer should not merge the states during a later screen simplification without their review.

The acceptance fixtures stay with the project: approved report without billing readiness, incomplete report, separate customer and later billing approval. They make the distinction testable after a change.

When discussing your own workflow, ask which object is approved, what evidence the reviewer sees and which consequence that evidence permits. Business connections and customer areas can then be scoped around decisions the organization has actually made.